Real photo: full window replacement in older residential areas of former Jiaonan district, Huangdao
Huangdao DistrictFull window replacement

Whole-house window replacement for older compounds in Huangdao (formerly Jiaonan)

Project Background

Built over 20 years ago, the original windows are old sliding plastic-steel units. The rubber seals have hardened, causing stiffness and difficulty in operation, with noticeable drafts near the windows in winter. Due to narrow hallway space and the fact that most neighbors are permanent residents, construction timing and noise levels require advance coordination.

Solutions

Adjust frame dimensions based on individual measurements and opening deviations. Constructed with 6060-T66 native aluminum profiles and a 1.8mm thickened-wall system casement window featuring triple-seal gaskets. During demolition, floor and wall protection is installed throughout. Old frames are removed and hauled away the same day. Sills are re-finished with proper drainage slope and subjected to water spray testing. Construction hours comply with property management regulations and are scheduled during daytime.

Customer Feedback

After installation, no cold drafts seep in even when sitting by the window in winter. The technician protected both the flooring and walls during removal, cleared all debris the same day, left the hallway tidy, and had no complaints from neighbors.
Huangdao District Old residential areas in the former Jiaonan districtOwner
Return to Case Studies
Lu ICP Prep 2026032208 No. -2