Real photos: Full window replacement case in a newly delivered residential complex in eastern Licang District, Licang District
Licang DistrictFull window replacement

Lichang East New Residence Whole Window Upgrade

Project Background

The new home was delivered recently with standard thermal-break windows featuring low-spec double glazing. As a result, the area near the windows feels noticeably cold in winter, and traffic noise from the street below is clearly audible. Since the owner has just completed renovations, they want to upgrade the windows without damaging the walls or flooring.

Solutions

Replace entire windows after individual window measurements. Constructed with 6060-T66 native aluminum profiles and 1.8 mm reinforced wall thickness, featuring a three-seal structure with double-glazed units; bedrooms facing the road include enhanced soundproofing. Interior finishing minimizes wall damage. Demolition and new frame installation proceed room by room with same-day sealing. In-house installation teams (no subcontracting) perform water testing upon completion.

Customer Feedback

After installation, the windows no longer feel cold in winter, and traffic noise from downstairs is significantly reduced. The technician worked room by room and completed the installation the same day, allowing immediate occupancy without any damage to walls or flooring.
Licang District Newly delivered residential community in eastern LicangOwner
Return to Case Studies
Lu ICP Prep 2026032208 No. -2